Industry & Energy Techical Projects | 210 6619 590 | info@bienter.gr

1 Short Description
CUSTOMER: WATERA HELLAS SA 
PROJECT: AUTONOMOUS PHOTOVOLTAIC SYSTEM 5.4kWp
LOCATION: EXO GIALOS, SANTORINI ISLAND

Description

Supply and Installation: Autonomous PV system 5.4 kWp on the container roofs in a desalination plant of DEYATH in Santorini.


Year of project operation: 5th/2023 

  Technical Data:  Services:
  • PV panels Luxor Solar GmbH
    STECA Solarix PLI 5000-48 inverter - charge regulator
  • 12 SUNLIGHT AccuForce 12V - 230Ah S
  • Solar VRLA Deep Cycle Batteries
  • Support System for Metaloumin PV panels
  • E/M application studies, selection and supply of E/M power generation equipment
    Project Management