Short Description OWNER: SHPP THERMOREMA S.A. PROJECT: CONSTRUCTION OF 1.950MWe SMALL HYDROELECTRIC POWER PLANT LOCATION: SPERCHIADA, FTHIOTIDA PREFECTURE, GREECE |
|
Description: |
Services: |
Small HydroElectric Power Plant – 1.95MWe - Plant production start: 2003 |
- Feasibility – Financial Studies
- Design – Licensing
- Selection and procurement of electrical production electromechanical equipment
- Project Management
|
Scope of work: |
Technical Data: |
- TURN KEY construction
- Intake: Civil works, equipment procurement/construction of electromechanical installations
- Penstock: Complete installation of GRP penstock, manufacturing of special parts
- Power House: Civil works, installation of electrical production equipment, manufacturing of penstock special parts and parts of electromechanical equipment
|
- Three (3) horizontal axis Pelton turbines, with two (2) noozles, manufactured by Gilkes (England), 680kW output each
- Three (3) synchronous generators, 400V, 50Hz, 3-phase, 1250kVA output each
- GRP (Glassfiber Reinforced Plastic) Penstock, diameter: DN900-DN800, length 6400m in total
|
BIENTER S.A. shareholders’ project